No | Power Plant Name | Project Location | Project Status | Installed Capacity (MWm) | Year of Operation |
1 | Soma WPP | Manisa | Operational | 312,1 | 2009 |
2 | Geycek WPP | Kırşehir | Operational | 168 | 2013 |
3 | Göktepe WPP | Yalova | Operational | 121,1 | 2022 |
4 | Poyraz WPP | Balıkesir | Operational | 77,1 | 2012 |
5 | Ege WPP | İzmir | Operational | 15,2 | 2015 |
6 | Metafor WPP | Bingöl | Operational | 49,7 | 2020 |
7 | Yakaağzı WPP | Ağrı | Operational | 33,6 | 2021 |
Total | 776,8 |
Soma WPP | Geycek WPP | Göktepe WPP | Poyraz WPP |
Ege WPP | Metafor WPP | Yakaağzı WPP |